How do I schedule an inspection?
Please call (925) 833-6620 to schedule an inspection. All inspection requests received by 4:00 PM can be performed on the next business day. You may request either a morning or afternoon inspection. Morning inspections are performed between 8:00 AM and 12:00 PM, while afternoon inspections are performed between 11:00 AM and 3:30 PM.

If necessary, you may call the morning of the inspection between 7:30 AM and 8:00 AM and speak with an inspector. However, we are not able to give out exact inspection times due to unexpected issues that may arise during the inspector's schedule. We will do our best to accommodate each applicant's needs.

Note: For registered users, you can schedule inspections online. Please see Citizen Services.

Show All Answers

1. When do I not need a building permit?
2. When do I need a building permit?
3. How do I schedule an inspection?
4. Can I call and get a specific time for my morning or afternoon inspection?
5. Why do I need a permit?
6. Who can take out permits for work at a residence?
7. How do I obtain a building permit?
8. What items need to be submitted for a spa permit?
9. How high does a fence have to be around a pool or spa?
10. Does a portable (self-contained) spa need a permit?
11. How deep does a gas line have to be buried?
12. How deep does an electric line need to be buried?
13. Is a permit required for a block retaining wall?
14. Do I need a permit for lawn sprinklers?
15. Is a permit required for replacement of a water heater?
16. Is a permit required to replace a garbage disposal or dishwasher?
17. Is a permit required to replace a shower pan, bathtub, or the tile surrounds?
18. Is a permit required to install a freestanding fireplace or fireplace insert?
19. Do I have to be present during the inspection?
20. What type of information do I need to submit for residential remodels and additions?
21. How long does it take for the plan review for additions?
22. Do I need to submit energy calculations for a residential addition?
23. Do I need to submit structural calculations for a residential addition?
24. What type of foundation can I use for my addition?
25. What codes is the City of Dublin using?
26. How many inspections do I need for my re-roof permit?
27. Do you have any type of expedition process for my plan check?
28. Is a resubmittal given the same turnaround time of three weeks as a first-time submittal?
29. Can I get two inspections for the same job in the same day?
30. If I do the work myself, why can't my valuation be lower than if I hired a contractor?
31. Is it better for the owner or the contractor to pull permits?
32. Can I pay for my business license when I pay for my permit and use one check?
33. Do I need to submit structural calculations for a residential addition?
34. Can I pay for my permit with a credit card?
35. Does the City offer any evening inspections?